SupplyOps Control Tower
Choose a workspace to enter. This is still demo login, not production authentication.
Choose a workspace to enter. This is still demo login, not production authentication.
Drop your replenishment Excel file here. The engine will validate, schedule, and build both views automatically.
PR Opened Date is shown for visibility and audit. The scheduling anchor is PR Approved Date, because that is when the order can enter planning.
For this hosted POC, the app recommends but never auto-assigns secondary. “Keep primary”, “Switch to secondary”, and lead-time edits are captured in the activity log for audit visibility while backend assignment remains human-controlled.
Current demo scope: HQ and vendor views only. Branch/store access is intentionally parked for Phase 2.
Use this view to spot delayed PRs, capacity bottlenecks and faster secondary-vendor opportunities before planners commit the batch.
| PR No. | PR Opened | SKU | Item | Type | Assigned Vendor | Pieces | Gold (g) | Basis | Base EDD | Calc EDD | OFD | Δ Days | Status | Remarks / Best Action |
|---|
| PR No. | PR Opened | SKU | Item | Type | Pieces | Gold (g) | EDD | OFD | Status |
|---|